Infrastructure

Infrastructure

  • A covered shed area of 12000 sqft and a land bank of almost 100,000 sqft for future use.
  • Induction Furnace Dual Track 500 kgs.
  • Boiler for steam generation.
  • Pre-forming Machine.
  • 2 no.s Hydraulic Moulding Machine for pattern making.
  • Gluing and assembly station for mould handling with hot-wire cutting machine.
  • Coating Blender with tank of capacity 1800 ltrs.
  • Drying rooms for moulds.
  • Compressor 93 CFM capacity.
  • Compaction Table for Sand box preparations.
  • Vacuum system.
  • 17 no.s Sandboxes to accommodate casting of size upto 650 mm cube and continuous pouring cycle of 24 hrs.
  • Sand plant including sand conveyor and bucket elevator.
  • Sand shakeout machine for metal stripping.
  • Sand cooler with 30 Hp blower for dust separation.
  • Fully mechanised transfer track system for sandbox movement.
  • Two EOT cranes.
  • Cooling Tower (2 no.s)
  • Power infrastructure with VCB, transformer, LT panel for connected load of 630 Kva.
  • DG for electrical support.
  • 3 no.s weighing machines.
  • RO water treatment plant.
  • Shot Blasting machine.
  • Ladle pre-heater and ladles (3 nos).
  • Fettling unit with angle grinders, bench grinders, etc.
  • A fully equipped lab to ensure quality.